FINANCIAL PROVIDER OF THE PROJECT

PARTNERS
OF THE PROJECT

 
 

NAVRCHOLU.cz
 


Basic information
Photo gallery of construction site area
Location and surroundings
Accessibility and public facilities
Map
Time schedule

 

Basic information


Místo:

Praha 8 – Ďáblice, ulice Hořínecká, č. kat. 608/2 a 608/26

Layout:

• 2 separate blocks (A and B) with its own entrance and lift
• 26 apartment of dwelling size from 1 room+kitchen and bathroom to 4 rooms + kitchen and bathroom with terrace and balcony,
• Out of them: 4 maisonettes and 2 flats with garden
• 2 non-residential spaces having a size of 37,3m2 and 81,44m2
• 26 roofed parking places in the building basement, 11 of them with a cellar
• closed common garden
 

Photo gallery of the construction site


panorama

static

active


panorama

static

active


panorama

static

active


panorama

static

active

 

 

Location and surroundings of the construction site


Ďáblice district is situated on the northern periphery of the city of Prague. In the north it borders on Březiněves, in the east on Třeboradice, Čakovice and Letňany, in the south on Střížkov and Kobylisy and in the west on Dolní Chabry. It is one of the smaller Prague quarters. 2 477 inhabitants live on an area of 738 ha. The majority of them live in family houses from the older housing development, but also from completely new housing development built in the 1990’s. On the territory of Ďáblice, you can find several Prague peculiarities such as for example, Ládví mountain that is with its 359 a.s.l. the highest place in Prague or Ďáblice observatory.
Not far from the planned residential construction, there are remains of the first steam powered brickworks so-called Battist´s brickworks with a chimney that will be as a technical monument reconstructed into a pizzeria. The ideal place for sports and relaxation is the forest complex Ládví (so-called Ďáblický háj-Ďáblice grove) in the close vicinity.
And the nearby aqua park Lagoon will surely be welcomed not only by families with children.
More information about Ďáblice and its surroundings you can find here.
 

PARK IN HOŘÍNECKÁ STREET
Just several steps from the construction place, directly in the Hořínecká street, there is a picturesque park.

ĎÁBLICKÝ HÁJ – ĎÁBLICE GROVE
To the south-east of the construction site at a distance of 500 m, there is situated one of the largest Prague forest complexes called Ďáblický háj. In the middle of it, there is a natural monument to Ládví where precious fossils occur. The hill named Ladvi with its 359 m above see level is the highest place in Prague. You can find more about the protected area here.

ĎÁBLICE OBSERVATORY
On the area of Ďáblický háj, there is apart from the other things situated the well-known Ďáblice observatory. You can find more about this observatory here.

PANORAMATIC VIEW FROM ĎÁBLICE OBSERVATORY
Panoramatic view from the Ďáblice observatory with the view of broad surroundings.

 

Accessibility and public facilities


Accessibility by traffic

Public transport
Ďáblice are accessible by municipal bus lines no.103, no. 345 and no. 368 from the metro C-line station Ládví and no. 202 from Čakovice direction. The municipal bus stop „Kokořínská“ is distanced 150 m from the construction place.
Metro Ládví – 11 minutes by bus no. 103
Globus Čakovice – 5 minutes by bus no. 202
A new metro C-line station Prosek, will be opened in 2008 that will be even closer to this location.

By car

Metro Ládví
Kaufland Prosek
Globus Čakovice
Supermarket centre Letňany, aqua park Lagoon

4 minutes
2 minutes
3 minutes
4 minutes

Public facilities

The availability of very good facilities for public is one of the advantages of this location. In the close vicinity, there is a kindergarten (Kučerová street 26), primary school (U Parkánu 17), general practitioner, eye doctor, dentist, post-office, library, sweet shop, five restaurants, shops and not least the supermarkets includind Tesco, Kaufland, and Globus located nearby.
 

 

Map





 

Schedule


The date of the effectiveness of the BUILDING PERMIT is 12.5.2006 (download here)

Beginning of sale: 1st quarter 2006
Beginning of construction: 2006, June
Completion of construction: 2007, June
 

 

copyright © horinecka.cz

created by PORTALL